Paired rehearsal runs. Two isolated fixture arms test a synthetic training portal service bulletin archive projection using synthetic non-sensitive records. Arm-A (baseline) uses Fixture-A: entries BUL-A1 through BUL-A5 on a legacy system at Division-Generation. Arm-B (proposed) uses Fixture-B: entries BUL-B1 through BUL-B5 on managed cloud staging at Division-Generation. Both arms share the same Division-Generation scope and matched input parameters. The training operations register owns effective revision and authorization state; staging owns display version. No real employee data, customer records, grid operational data, NERC CIP assets or bulk electric system information are used. All identifiers are synthetic. Zero production routes or external endpoints.
Fixture-A initial state (baseline arm). Division-Generation legacy system contains BUL-A1 through BUL-A5 as local intranet bulletin board with no version tracking, no cross-division visibility and no search capability. Reset: clear Fixture-A entries and restore from seed data. End state after each case: intranet bulletin unchanged (read-only scenario) or entry present with no version metadata.
Fixture-B initial state (proposed arm). Seed BUL-B1 through BUL-B5 in the synthetic source register for Division-Generation, then start the staging viewer at build D6 and config C1. The register approves business revision V1. The first two entries are already visible. The held-out records BUL-B3, BUL-B4 and BUL-B5 are seeded and approved but absent from the served projection. The staging journal and dispatch records start empty. Restore both arms to their named seeds between independent tests, then inject the stated fault. For P2 and exact replays, deliberately retain the authorized P1 state in that run. Use the same roles, scopes and inputs translated between A and B fixture namespaces, without sharing their side effects.
Browser accessibility. Each training bulletin entry in the staging viewer uses a native <button> with aria-expanded to toggle an inline detail panel. Tab advances focus sequentially. Enter or Space toggles disclosure; Escape collapses it. A separate nonfocusable role="status" region announces state changes with text and shape indicator (circle for current, triangle for superseded), not color alone. Focus ring is a 2px solid outline visible against light and dark backgrounds. No focus moved on state change. Planned observations: (1) Chrome 126 on Windows 11 with keyboard navigates BUL-B3 disclosure, verifies expanded panel contains revision V1 and config C1, then collapses; (2) Safari 18.0 with VoiceOver on iPad navigates to BUL-B5 and verifies the status region announces "BUL-B5: current" on simulated register read. 2 of 2 observations, zero staging effects from accessibility checks, zero public writes.
P1 details. The training administrator approves K1 for BUL-B3 in Division-Generation with V1, image D6 and config C1. Start with no displayed BUL-B3 and no journal entry for K1. The release makes this training bulletin visible once. The training portal shows the bulletin title and revision within the approved training group. Check that the staging journal ties the result to receipt R1, and independently confirm the source still has V1, approved and unchanged. Count one staging projection effect and zero source writes. The read-only viewer does not perform the release.
P2 details. Keep BUL-B3 and receipt R1, then use distinct key K2 for BUL-B4 in Division-Generation. The training administrator checks that the second training bulletin has V1 approval and that BUL-B4 is still absent from staging. Release BUL-B4 at D6/C1 and read back both entries. The journal shows R2 for K2 and the original R1 for K1. The source register still approves V1 for both. There is one new staging projection effect and zero source writes.
P3 details. Key K1 replayed. Journal returns durable prior result from P1 with matching identity (K1), scope (Division-Generation) and payload (D6/C1). Authorization rechecked against register V1. Zero staging effects, zero source effects. Runtime read-back: BUL-B3 still shows entry at D6/C1. Receipt R1 returned (not reissued).
F9 details. K1 delivery succeeded (P1) but acknowledgment lost. Journal lookup: K1 applied, one prior staging effect. Key K1, scope Division-Generation, payload D6/C1 matched. Runtime read-back: BUL-B3 at D6/C1 confirmed. Source read-back: register V1 unchanged, zero source effects. Receipt R1 returned. Zero new effects. If current authority denies or withdrawal present: approved safe state displayed, hold for resolution.
F10 details. Seed K5 for BUL-B5, Division-Generation, with an immutable request for business revision V1 on D6/C1. This training bulletin is absent from the viewer. Inject a disconnect before worker admission. The staging dispatch ledger records K5 as blocked before delivery, and its admission fence confirms no worker accepted the request. An independent staging journal read confirms no K5 receipt or pending work. The training administrator verifies those positive no-delivery records, the absent BUL-B5 projection, and current V1 approval before releasing one identical K5 request. Expect receipt R5 with K5 applied, BUL-B5 now visible at Division-Generation on D6/C1 for V1, and the authority register still approving V1. Count one new staging projection and zero source writes. If evidence, scope or approval is missing, keep the hold. An empty lookup alone does not permit a retry.
F11 details. Check a durable pending K6 and an unavailable K7 status separately for Division-Generation. For K6 the operator can read a pending admission record and the viewer holds its current authorized projection. For K7 both dispatch and journal status are unavailable, so the outcome might be applied, pending or absent. The training administrator holds either request without resending, blocks any unconfirmed new display and checks the authoritative status when it is available. Record zero additional projection effects and zero source writes caused by the hold. Preserve the distinction between unknown status and evidence of no effect.
F12 details. Candidate image D7/C2 deployed to staging. Readiness probe fails (health endpoint returns error). Candidate D7/C2 never served traffic; prior verified D6/C1 continues serving without interruption. Zero runtime switches. Training Administrator confirms D6/C1 is current with register V1 and no withdrawal. Candidate D7/C2 artifacts removed from staging pipeline. One bounded staging effect: failed candidate recorded. Runtime read-back: D6/C1 confirmed serving. Source read-back: register V1 unchanged, zero source writes. If no compatible prior release exists: serve last approved safe state, escalate to operations director.
F14 details. Candidate D8/C3 deployment halted at 40% rollout. Stage candidate activity recorded separately from promotion state. Prior verified state: D6/C1 from register V1. No promotion occurred, no source change. Partial D8/C3 artifacts cleaned up. Runtime read-back: D6/C1 confirmed at served scope. Source read-back: register V1 unchanged.
F16 details. At Division-Generation, serve BUL-B3 on D7/C2 with the current approved source revision V2. The training administrator authorizes switching only the staging runtime to D6/C1 after confirming readiness, that it can render V2 for the same scope, and that the source authority still approves that revision. Read BUL-B3 at V2 on D7/C2 before the switch and at V2 on D6/C1 afterward. Separately confirm the source register still has V2 approved. Count one served runtime switch and zero source writes. If approval, readiness or compatibility fails, hold the switch and show the approved non-disclosing notice.
F17 details. A fictitious forbidden-data marker (tagged "CIP-TEST-MARKER") is injected into BUL-B3. Training portal pipeline detects the marker during rendering. BUL-B3 rejected from bulletin display and quarantined. Pipeline log records safe metadata only: marker ID, record ID and timestamp; no forbidden data content in the log. Rendered bulletin verified to exclude the marker. No actual CIP asset data, operational endpoints or real employee records enter the staging environment. NERC CIP-002-5.1a applicability is determined by listed Responsible Entities based on relevant assets and BES Cyber Systems; regulatory classification is an owner-provided input to this scoped engagement, not a determination by ZTABS. Zero source effects.
F18 details. Current runtime D7/C2; rollback target D5/C0 has incompatible schema (missing required field added in D6). Compatibility check fails; rollback blocked. Authority check: if D7/C2 is currently confirmed by register with no withdrawal, D7/C2 continues serving. If D7/C2 authority is unconfirmed or withdrawn: non-disclosing placeholder served (no content, version or metadata exposed). Operations Director escalation required. Runtime read-back: D7/C2 or placeholder confirmed. Zero source writes.
| Case | Baseline (Arm-A) | Proposed (Arm-B) |
|---|
| P1. Display BUL-B3, K1 | Legacy shows BUL-A3; no revision | See P1 details |
| P2. Display BUL-B4, K2 | Legacy shows BUL-A4; no revision | See P2 details |
| P3. Replay K1 | BUL-A3 reshown; no replay record | See P3 details |
| F1. Wrong scope | Shows any entry | Scope mismatch; rejected; zero effects |
| F2. Stale generation | Shows stale data | Generation check detects stale; blocks; if authority unknown: safe notice |
| F3. Cross-scope access | Any scope data accessible | Scope check fails; blocked; zero effects |
| F4. Revoked entry | BUL-A4 displayed; revocation not reflected | Register lookup detects revocation; blocked; safe notice |
| F5. Changed payload on K1 | BUL-A3 unchanged; mismatch undetected | Payload hash mismatch; safe conflict code; R1 disclosed only after scope, role and withdrawal are verified; restricted payload never served |
| F6. Stale revision proposed | BUL-A3 displayed; stale undetected | Generation check rejects stale; current unchanged |
| F7. K3 authorization denied | BUL-A3 displayed; denial not logged | Denied; staging and register unchanged; logged |
| F8. K4 approved then withdrawn | BUL-A4 displayed; withdrawal unrecorded | Withdrawal detected; staging unchanged; logged |
| F9. K1 applied, ack lost | BUL-A3 displayed; ack loss undetectable | See F9 details |
| F10. K5 absent, ack lost | BUL-A5 absent; no dispatch record | See F10 details |
| F11. K6 pending, K7 unknown | No status record; timeout unrecorded | See F11 details |
| F12. Readiness probe fails | Display continues; no health gate | See F12 details |
| F13. Missing telemetry | Display continues; no telemetry gate | Promotion blocked until telemetry confirmed |
| F14. Stopped mid-rollout | Display unchanged; partial state unknown | See F14 details |
| F15. Expired cached entry | Expired BUL-A5 displayed; no expiry gate | Expiry check fails; blocked; safe state served |
| F16. Compatible fallback | No prior version record | See F16 details |
| F17. Forbidden-data marker | BUL-A3 unchanged; condition undetected | See F17 details |
| F18. Incompatible rollback | No schema gate; outcome unknown | See F18 details |
| Positive state | 3 of 3 correct | Correct state / P1 to P3 |
| Failure state | 18 of 18 correct | Correct state / F1 to F18 |
RTO and RPO measurement for restored synthetic training bulletin projection. Interruption mark: predeclared simulated point (10:00). The operations director owns restore authorization. Training portal bulletin archives are staff-facing. Source read-back from training register required after each restore trial. Per AWS recovery objectives and periodic recovery validation. Each row is a planned synthetic observation, not a measured result. A metric that fails its threshold blocks promotion.
Denominator: 2 planned observations per metric (1 pass, 1 breach checkpoint). The synthetic condition distinguishing this trial from the sector's normal path is the restored bulletin uses a superseded revision for BUL-B4 to exercise version-aware validation.
| Metric (threshold) | Observation | Classification |
|---|
| RTO trial 1 (30 min) | Interruption 10:00, usability verified 10:23, register V1 read-back confirmed | 23 min, pass |
| RTO trial 2 (30 min) | Interruption 10:00, usability verified 10:42, register V1 read-back confirmed | 42 min, breach |
| RPO trial 1 (10 min) | Interruption 10:00, latest reconciled record 09:54 | 6 min, pass |
| RPO trial 2 (10 min) | Interruption 10:00, latest reconciled record 09:44 | 16 min, breach |
Residual risks. Staging rehearsal does not cover production staff volumes, real employee data, operational grid systems, NERC CIP-scoped assets or live utility operations. Post-cutover writes require separate reconciliation per AWS migration cutover guidance. NERC CIP boundary determination is the responsibility of the listed Responsible Entity per CIP-002-5.1a. No measured results.
This is a hypothetical scenario for illustration. Actual scope, timeline and cost depend on your requirements.