Our ERP development methodology for Denver businesses builds industry-specific systems that match operational workflows rather than forcing businesses to adapt to generic software. Phase 1 — Process Mapping (2-3 weeks): understanding the business: operational workflows (documenting every process the ERP must support: order-to-cash, procure-to-pay, production, inventory management, quality, and: regulatory compliance — with: specific attention to: industry-specific processes that generic ERP cannot handle — brewery production scheduling, cannabis Metrc compliance, and: aerospace AS9100 quality workflows), data requirements (identifying all data the ERP must manage: master data (products, materials, customers, suppliers, equipment), transactional data (orders, production records, shipments, invoices), and: analytical data (cost reports, performance metrics, compliance reports)), and integration requirements (systems the ERP must connect to: accounting (Sage, QuickBooks), e-commerce (Shopify), compliance (Metrc, TTB), quality management (for aerospace), and: industry-specific tools (brewery: BeerSmith for recipe management; cannabis: lab LIMS for testing))). Phase 2 — ERP Design (3-4 weeks): designing the system: module architecture (defining: ERP modules and their relationships — core modules typically include: sales and order management, purchasing, inventory, production, quality, finance, and: reporting — with: industry-specific modules (brewery: recipe management and TTB reporting; cannabis: Metrc integration and batch compliance; aerospace: contract management and ITAR tracking)), user interface design (ERP adoption depends on: usability — designing: role-specific interfaces: production floor (touch-optimized for tablets with gloves in a brewery or manufacturing environment), office (full-featured desktop interface for: planners, purchasers, and: accountants), mobile (field access for: delivery drivers, site inspectors), and: executive (dashboard-focused views for: management oversight)), and compliance integration (building: regulatory compliance into ERP workflows as a native capability — not a bolt-on module — so that: compliance data is captured as: a natural part of production tracking rather than: a separate data entry burden)). Phase 3 — Development (10-16 weeks): building the ERP: core platform (building the foundation: product and material master data management, inventory management (multi-location, lot-tracked, with: unit-of-measure conversion), purchase order management, sales order management, and: basic financial integration — this core is: common across industries and: forms the foundation for: industry-specific modules), industry modules (building the modules that: differentiate the ERP for each industry: brewery — recipe management, batch production with: fermentation tracking, TTB excise tax calculation, and: taproom POS integration; cannabis — Metrc integration, batch compliance tracking, testing workflow, and: waste management; aerospace — shop floor execution, quality inspection with AS9100 workflows, contract management, and: ITAR tracking), and integration development (connecting the ERP to: external systems — the integrations that make the ERP: part of the broader business ecosystem rather than: another disconnected tool)). Phase 4 — Data Migration and Launch (3-5 weeks): deploying safely: data migration (moving: master data and historical transactions from: existing systems — with: validation at every step to: ensure data integrity — for businesses with: years of production history: this is: a critical step that directly affects: the ERP's analytical value), parallel operation (running: the new ERP alongside existing systems for: 2-4 weeks — comparing: outputs (financial reports, inventory counts, compliance reports) to: verify accuracy before: decommissioning legacy systems), and training (role-specific training for: all ERP users — with: hands-on practice using: actual business data in a training environment — plus: super-user training for: internal staff who will: become the first line of: ERP support and: process improvement)).